Skip to content

Sales Signals: 2026-01-01 to 2026-01-27

Generated: 2026-01-27 Meetings covered: 7 meetings across 7 prospects


Executive Summary

January 2026 sales activity shows strong momentum with 7 prospect meetings across diverse industries including retail (Levi's), technology (Checkr), life sciences (Bio-Rad), automotive (TI Fluid Systems), logistics (Euroports, Ocado), and engineering (CRCE). The consistent theme across all conversations is dissatisfaction with manual Excel-based forecasting processes and rule-based categorization systems that fail to deliver needed accuracy.

Forecasting accuracy and cash positioning optimization emerged as the dominant pain points. Multiple prospects (Bio-Rad, TI Fluid Systems, Checkr) explicitly mentioned the disconnect between FP&A forecasts and actual cash positions. The AI-powered categorization capability resonated strongly, with prospects citing 30-40% uncoded flows in existing TMS systems (Ocado) and time savings from 2-3 days per week to hours (CRCE, TI Fluid Systems).

Deal velocity is encouraging with 4 prospects (Euroports, CRCE, Checkr, Ocado) showing Q1 2026 decision timelines and active next steps. The competitive landscape is active, with Euroports evaluating 4 vendors and CRCE comparing against solutions quoted at 300k GBP. Palm's positioning on implementation speed (4 weeks vs 5 months) and pricing (50-80k GBP vs 300k GBP) is creating clear differentiation.


Feature Signals

High Demand (Multiple Prospects)

Feature Prospects Requesting Priority
AI-powered transaction categorization Euroports, Ocado, CRCE, Levi's Critical
Cash flow forecasting (ML + manual hybrid) All 7 prospects Critical
Multi-currency support Euroports, Ocado, TI Fluid Systems, CRCE High
ERP integration (SAP, Oracle) Levi's, Bio-Rad, Checkr, CRCE High
Cash positioning dashboard Ocado, CRCE, Bio-Rad High
Variance analysis / notable activity alerts Checkr, Ocado High
Zero-balance account handling Euroports, Levi's, TI Fluid Systems Medium
Self-service dashboard builder Ocado Medium

Individual Requests

Feature Prospect Context
Chatbot for transactions, comparisons, charts Euroports Wants conversational interface for data exploration
Real-time overdraft risk flagging Levi's, Ocado Alert when approaching overdraft limits
Template-free file uploads with AI column mapping Levi's Reduce IT dependency for data ingestion
Dual category setup (transaction + higher-level) Euroports Need both granular and summarized views
Multi-entity consolidation Checkr 5 entities rolling up to single view
Daily view for next month (peaks/troughs) TI Fluid Systems See cash timing within month
Longer forecast horizon (beyond 13 weeks) TI Fluid Systems Strategic decision support

Pain Points with Current Solutions

Manual Processes

Pain Point Prospects Severity
Excel-based forecasting consuming 2-3 days/week CRCE, TI Fluid Systems, Bio-Rad Critical
Manual data consolidation across entities CRCE (20+ entities), TI Fluid Systems (58 entities) Critical
1.5-2 hours daily on cash positioning Bio-Rad High
Separate daily/weekly/monthly forecast tabs Checkr Medium
MacBook/Google Sheets compatibility issues Checkr Low

Forecasting Accuracy

Pain Point Prospects Details
Rule-based categorization incomplete Ocado (30-40% uncoded), Bio-Rad TMS tagging not delivering accuracy
FP&A vs cash forecast misalignment Checkr, TI Fluid Systems Aspirational vs conservative disconnect
Limited ERP visibility (45 days max) TI Fluid Systems No future payment forecasting
DSO volatility Checkr 40 days normal, spikes to 47-49
Lumpy cash flows from top customers Checkr Top 20 of 115K customers drive variance

Data Visibility

Pain Point Prospects Details
20+ different Excel processes for EOD balances Bio-Rad Fragmented data pulls
Salaries/taxes don't flow through ERP TI Fluid Systems Manual tracking required
No backup when people unavailable TI Fluid Systems Single points of failure
Decentralized execution inconsistency TI Fluid Systems 58 entities, varying quality
Indonesia/Asia/South America less mature Euroports Need automated categorization

Objections & Concerns

Common Objections

Objection Frequency Our Response
"Currently no bandwidth for new project" Bio-Rad, TI Fluid Systems 4-week implementation, minimal resource requirement
"Waiting for new leadership input" Checkr (new CFO March), CRCE (CFO approval) Schedule follow-up post-transition
"2026 is major transition year" TI Fluid Systems (banking changes + acquisition) Phased approach, start small
"Already invested in Kyriba/TMS" Ocado, Bio-Rad Complement vs replace, API integration

Company-Specific Concerns

Company Concern Status
Checkr New CFO starting March 2026, need their input Demo mid-Feb, follow-up post-March
Bio-Rad Team expansion in progress, no capacity H1 2026 toolset decision, H2 implementation
TI Fluid Systems Major banking transitions underway Still interested in demo Feb 9th
CRCE CFO traveling, back in 2 weeks Follow-up Jan 31, target March implementation

Competitive Intelligence

Competitors Mentioned

Competitor Mentioned By Context
TIS Euroports Demo scheduled Monday, one of 4 finalists
Kyriba Ocado, Bio-Rad, Levi's Existing TMS, "scratching the surface"
G Treasury Checkr Evaluated in TMS review
Treasury Suite Checkr Evaluated in TMS review
Panex Checkr Evaluated in TMS review
Oracle EPM Checkr Most expensive option
Approach (Netherlands) Euroports Belgium uses for some categorization
Crown Data Systems TI Fluid Systems Current forecasting tool (5-6 years)
Unnamed vendor CRCE Quoted 300k GBP, 5-month implementation

Win/Loss Factors

Factor Importance Our Advantage
Implementation speed High 4 weeks vs 5 months (CRCE comparison)
Pricing High 50-80k GBP vs 300k GBP (6x difference)
Categorization accuracy High 95%+ with AI vs rule-based gaps
Data ingestion flexibility High API, MT940, BAI, Swift, XML, CSV, PDF, email
User friendliness High Decision criteria for Euroports
No per-seat licensing Medium Mentioned as differentiator at CRCE

Deal Signals

Hot Leads (Strong Signals)

Company Signal Timeline Next Step
Euroports NDA signing next week, PoC setup end of next week Mid-Feb sandbox comparison Category list refinement, PoC data
CRCE CFO decision maker engaged, strong efficiency interest March 2026 implementation target Jan 31 follow-up, ROI business case
Ocado Key decision maker introduced, internal discussion scheduled Near-term decision Send On Running case study, follow Wednesday

Warming Up

Company Signal Timeline Next Step
Checkr Q2-Q3 2026 implementation target, IPO readiness driver Demo mid-Feb 2026 In-person SF meeting week of Jan 27
Levi's Sees value for international operations, NDA needed Gurjit in SF Feb-July NDA execution, potential office visit

Longer Timeline

Company Signal Timeline Blocker
TI Fluid Systems Demo scheduled Feb 9th, strong interest 2026 transition year Banking changes, acquisition integration
Bio-Rad Follow-up scheduled Feb 17th H1 toolset decision, H2 implementation Team expansion, no bandwidth

Meetings by Prospect

Euroports (1 meeting)

2026-01-23: PoC Data Alignment - Final vendor selection with 4 vendors including Palm - BMG cash pool: ~15 accounts across Belgium - 80-83% EUR, 10% USD, 5% GBP, 2% BRL - Primary PoC objectives: categorization + forecasting - NDA expected early next week, PoC setup by end of next week

Levi's (1 meeting)

2026-01-06: Demo/Forecasting - Kevin: 15 years at Levi's, manages projects and in-house bank - Building BI tool for Excel forecasting (skeptical it will work) - Physical ZBAs complicate forecasting - International operations significantly more complex than US - Excited about reduced IT dependency through file absorption - 7 years historical data available for PoC

Ocado (1 meeting)

2026-01-15: Synch - Michael Braha (Director Treasury) introduced as key decision maker - Using Kyriba TMS but "scratching the surface" - 30-40% uncoded flows in Kyriba - Manual Excel 13-week forecasts across entities - 3-4 week implementation timeline discussed - Internal discussion scheduled early next week

Bio-Rad (1 meeting)

2026-01-22: Intro Call - Antti Kyyro (International Treasurer, 7 years tenure) - 70+ year old cash-rich life sciences company - SAP TRM + Kyriba overlay architecture - ~20 different Excel processes for EOD balances - 40-50M cash in APAC/EMEA could be optimized - Team expansion in progress, no bandwidth currently - Follow-up: February 17th

Checkr (1 meeting)

2026-01-16: Intro Call - Bryan Lamb: sole Treasury person managing 5 entities - YC 2014 company, $800M revenue end of Q3 2024 - Major clients: Uber, DoorDash, Lyft, Airbnb, Instacart - Preparing for IPO readiness 2027 - New CFO starting March 2026 - Demo mid-February, potential in-person SF meeting week of Jan 27

TI Fluid Systems (1 meeting)

2026-01-22: Intro Call - Diane Wilson managing ~80 different forecasts across 28 countries - Post-ABC acquisition integration challenges - Moving from cash-rich (400M+) to cash-tight environment - Current tool (Crown Data) reduced forecasting from 2.5 days to 2-3 hours - 58 local entities with decentralized execution - Demo scheduled week of February 9th

CRCE (1 meeting)

2026-01-23: Demo - George's first product demo - 5 people spending ~3 days/week on manual forecasting - Migrating SAP to IFS (12-month build) - ~20 entities, primarily Citibank and RBS - Previous quotes: 300k GBP, 5-month implementation - Palm positioning: 50-80k GBP, 4-week implementation - Follow-up: January 31st, target March implementation


Patterns for Product

Integration Priorities

  1. Kyriba API integration - Mentioned by 3 prospects (Ocado, Bio-Rad, Levi's) as current TMS
  2. SAP integration - Bio-Rad (SAP TRM), CRCE (SAP to IFS), core ERP for enterprise
  3. Oracle Fusion - Checkr upgraded from NetSuite, expensive licensing driving utilization pressure

UX Patterns Requested

  1. Conversational/chatbot interface - Euroports wants natural language queries for transactions
  2. Self-service dashboard builder - Ocado highlighted this capability
  3. Mobile/MacBook compatibility - Checkr experiencing Google Sheets issues

Data Challenges to Address

  1. Zero-balance account handling - Euroports, Levi's, TI Fluid Systems all have ZBAs complicating views
  2. Multi-currency consolidation - Most prospects operate 3+ currencies
  3. Decentralized entity rollup - TI Fluid (58), CRCE (20+), Checkr (5) need consolidation
  4. Salary/tax flows outside ERP - Manual tracking gap highlighted by TI Fluid Systems

Positioning That Resonates

  1. Implementation speed (4 weeks vs 5 months)
  2. Pricing transparency (50-80k vs 300k)
  3. 95%+ categorization accuracy (vs rule-based gaps)
  4. Flexible data ingestion (API, MT940, BAI, Swift, XML, CSV, PDF, email)
  5. No per-seat licensing
  6. "TMS lite" positioning vs heavy enterprise solutions

Action Items

Immediate (This Week)

Action Owner Prospect Due
Send NDA reminder to legal team Matthias (Euroports) Euroports Monday Jan 27
Provide standard category list Giannis Euroports This week
Send On Running case study + slide deck George Ocado ASAP
Build ROI business case document George CRCE Before Jan 31
In-person meeting SF Gurjit Checkr Week of Jan 27

Near-Term (February)

Action Owner Prospect Due
PoC setup and testing Palm team Euroports End of next week
Follow-up call George CRCE Jan 31, 11:00 AM
Product demo TBD Checkr Mid-February
Demo week George + Giannis TI Fluid Systems Week of Feb 9th
Technical deep dive Giannis Bio-Rad Feb 17
SF treasurer dinner invitation George Bio-Rad (Andy) February

Pipeline Management

Action Prospect Timing
Follow-up if no response Ocado Wednesday this week
Internal discussion check-in Dette + Kevin Levi's internal review
New CFO onboarding follow-up Checkr March 2026
Pre-call questionnaire Bio-Rad Before Feb 17

Source Meetings

Date Company Meeting Local File
2026-01-06 Levi's Demo/Forecasting docs/transcripts/sales/levis/2026-01-06-demo-forecasting.md
2026-01-15 Ocado Synch docs/transcripts/sales/ocado/2026-01-15-synch.md
2026-01-16 Checkr Intro Call docs/transcripts/sales/checkr/2026-01-16-intro.md
2026-01-22 Bio-Rad Intro Call docs/transcripts/sales/bio-rad/2026-01-22-intro-call.md
2026-01-22 TI Fluid Systems Intro Call docs/transcripts/sales/ti-fluid-systems/2026-01-22-intro.md
2026-01-23 Euroports PoC Data Alignment docs/transcripts/sales/euroports/2026-01-23-poc-data-alignment.md
2026-01-23 CRCE Demo docs/transcripts/sales/crce/2026-01-23-demo.md